Large Dams, barrages, reservoirs and canals

Dams have often been regarded as man’s response to nature’s vagaries, to mitigate flood and drought by containing water and releasing it as per demand and supply. Lately, dams are seen more as hydropower generators with flood mitigation, irrigation and drinking water supply only being additional benefits. This can be because of the increased acceptance that dams and canals, as awe inspiring as their structures might be, fail to deliver water to more than half of their commands. However, data and experience tell us that even the hydropower generation is also falling way below the promised numbers.

History and extent of dams in India

India’s first dam is the Kallanai built on the Cauvery river by King Karikalan of the Chola dynasty around 2,000 years ago. The dam, which is still functional and irrigates millions of acres, spans 329 m in length and 20 m in width. However, it was only post-independence that India’s love for big dams became more intense with the commissioning of a slew of projects including the Hirakud (1957), Gandhisagar (1960), Bhakra-Nangal (1963) and Nagarjuna Sagar (1967). Since then, the country has been continuously working on reining in its rivers for want of power, irrigation and domestic and industrial water supply needs. Almost half of the large dams in the country were built in the two decades of 1970-90. Maharashtra has the maximum number of large dams in the country (1845) followed by Madhya Pradesh (905) and Gujarat (666).

Map of major dams in India

A multi-purpose dam project includes one or more dams, infrastructure for generation of hydropower, infrastructure for housing of workers and for offices, a distribution network of canals and pipe systems, and access roads. All these have their individual and cumulative impacts on the river and the surrounding environment. Here also lies an opportunity to minimise the 'collateral damage' caused by dam projects by minimising the footprint of these adjuncts.

Dams as power generators

Hydropower is often billed as a renewable, economic and non-polluting source of energy and hence there is an increased emphasis on building dams especially in the hydrologically-rich but geologically-fragile Himalayan states. An assessment study put the hydroelectric power potential of the country at about 84,000 MW with maximum schemes envisaged on Brahmaputra basin (226) followed by Indus basin (190) and Ganga basin (142).

Possibility of revenue generation through sale of power units to other states and private players remains the main draw for state governments to invite project developers. However, reports suggest that poor financial conditions of discoms make it a poor proposition. Average generation per MW of hydro capacity in India in 2014-15 was over 20 per cent less than that in 1993-94.

Dams and canals for irrigation

Canal system of irrigation had been prevalent in India for centuries but it was the Ganga Canal that laid the foundation for large scale diversion of water to farms.

Number of dams in various statesThough the work was undertaken under the leadership of British Colonel Proby Cautley, it was the traditional acumen of local villagers that made the vast network possible. The canal was commissioned in 1855 irrigating around 5,000 villages. Today, the system irrigates nearly 9,000 km² of agricultural land in 10 districts of Uttar Pradesh and Uttarakhand.

The start of the Green Revolution in the mid 1960s put the spotlight on canal irrigation as the new hybrid crop varieties bred on heavy dose of chemical fertilizers and pesticides demanded assured irrigation. However, the increased investment and network expansion dealt little benefits. The World Commission on Dams in its year 2000 report found that the contribution of large dams to increased food grains production in India was less than 10 percent.

Loss in seepage, huge demand-supply gap, diversions under political pressures and comparatively easier and local availability of groundwater through pervasive use of borewells are the reasons for decline in efficiency trend.

Between 1996-97 and 2002-03, the area under canal irrigation declined by 2.4 million ha (13.8 per cent), the area under tank irrigation fell by 1.4 million ha (42.4 per cent), and the area irrigated by all other sources declined by 1 million ha (28 per cent). The only irrigation source that increased its share was groundwater wells, by 2.8 million ha (more than 9 per cent).

A study of 210 major and medium irrigation projects by SANDRP used the data supplied by the Ministry of Agriculture to show that after investing Rs 130,000 crore, these delivered 2.4 million ha less irrigation during 1990-1 to 2006-7. This means, the governments have to invest twice as fast in canal irrigation projects every year just to keep their command areas from shrinking

The study said that around Rs 1,00,000 crore was wasted in the name of improving irrigation. Feasibility studies were fudged in the case of most of the projects with huge investments, over-optimistic predictions were made and very little money was earmarked for basic maintenance such as desiltation. In some cases, political interests ensured that water was diverted to unviable areas at the cost of needier regions.

Dams and flood control

The efficiency of dams to withhold floods has always been put to question. Critics have also termed dams as harbinger of floods claiming that the essential scientific assessment for consistent release of water to avoid build up is rarely done.

Absence of a standard operating procedure for releasing water from the dam gates was evident in 2014 when 24 students picnicking in a river were swept away due to sudden release of water from Larji dam in Himachal Pradesh

Similarly, area downstream of Hirakud dam in Odisha has witnessed 14 floods in recent past with nine caused by sudden release of water from the dam. A major reason is that the dam has not changed its flood control strategy for 23 years while the rainfall pattern has undergone major changes in local areas. Lack of a coordination mechanism between neighbouring states about water flow also leads to emergency situations like one in 2011 when sudden release of water flow from upstream dams in Chhattisgarh led to breaching of danger mark in Hirakud.

In Gujarat, sudden release of large quantities of water from Ukai dam led to the biggest flood of 34 years in Tapi river submerging over 80 per cent of Surat, killing 150 persons and stranding over 20 lakh. Similar examples have been reported from other states.

Problem with 'training rivers'

Dams cause a disruption in the flow of a river by transforming it into a series of pools separated by dry stretches. The environmental impacts can be felt on the landscape, water resources, forest cover, and biodiversity. The Himalayas are almost equally distributed between zones 4 and 5. While a series of dams are being constructed in a seismically vulnerable and ecologically fragile zone, not only is optimisation of the planned development not considered, but the cumulative effects of the dams also are not considered. On a local level, blasting increases the possibility of landslides, and causes air and noise pollution. Quarrying on hill slopes and in the riverbed causes pollution and destabilisation of the slopes.

The large scale construction that is an inescapable part of hydropower development leads to deforestation. It has been observed that construction leads to the inadvertent loss of much more forest than has been accounted for. The presence of a dam on a river also impacts the ecosystem by bringing about a drastic change in the species composition. Invasive species tend to appear and flourish while suppressing endemic species and even causing some to become extinct. 

An affidavit filed by Ministry of Environment and Forest in the Supreme Court admitted the role of hydropower projects in Uttrakhand disaster in 2013. It said that “the maximum damage sites in the disaster affected areas (were) located either upstream or immediately downstream” from hydropower projects.

According to a paper by the United Nations Environment Programme, dams and their associated reservoirs permanently impact on freshwater biodiversity by several processes. Climate change has also been linked with dams. Studies show that large dams cause anoxic decomposition which leads to the formation of methane gas. This ‘greenhouse gas’ produced by dams may contribute to global warming to an appreciable extent. According to a study, dams contribute about 24 per cent of the total methane emissions in the world. Of these emissions, India contributes slightly under 28 per cent.

Submergence and displacement

Though the benefits of a dam are often exaggerated, the estimates related to land submergence and possible displacement of people are invariably kept low to paint a positive picture.

From Hirakud to Bhakra Nangal to Tehri and many more, scores of affected families were not rehabilitated at all. Those rehabilitated also complained about lack of livelihood opportunities and poor living conditions. Narmada Valley project, around which a big people's movement was built, remains the most controversial irrigation and hydropower plan. Envisaging around 30 irrigation and hydroelectric multipurpose dams, the project's environmental and social costs vis-a-vis the benefits have been cause of much debate and litigations. Sardar Sarovar dam, the largest structure on Narmada river, is believed to have displaced over 3 lakh families and is expected to displace additional 2.5 lakh families if its height is further increased by recently-approved 17 metre.

The World Commission on Dams in its report says: “While dams have delivered many benefits and made a significant contribution to human development, in too many cases the price paid to secure those benefits, especially in social and environmental terms, has been too high and, more importantly, could have been avoided.”

Political issues around dams

Shortage of water is increasingly being felt resulting in conflicts across the world. For the same reason India is facing disputes both within and outside its boundaries. While Punjab, Haryana and Rajasthan are fighting over water sharing from Bhakra Nangal, Kerala and Tamil Nadu went to court on diversion of water from Mullaperiyar dam.

On the other hand, Pakistan claimed that design of Baglihar project in Jammu and Kashmir violated the Indus Water Treaty whereas India is wary of China's plan to tame Brahmaputra waters through a series of dams. Similar are the concerns of Bangladesh which lies further downstream over India's attempt to build dams.

Way forward

It is evident that instead of focusing on building new dams, we need to attend to underperformance of existing projects. Decentralised solar, wind energy and small hydroelectricity projects with local communities as their managers as well as consumers can offer sustainable alternatives to big dams. This will not only mitigate ecological and social impacts of power generation but also reduce cost of power generation and distribution.

For irrigation purposes, revival of traditional community-managed networks like kuhls of Himachal Pradesh, phad irrigation of Maharashtra and recharging of underground aquifers through rainwater

The World Commission on Dams lists seven steps as a remedy to issues arising from dams. These include gaining wide public acceptance, exploration of alternatives to dams, optimal usage of existing structures, protection and restoration of ecosystems at river basin level, recognising entitlements of the affected people, compliance with applicable regulations and regional co-operation on trans-boundary rivers.

A few of the western countries, having realised the futility of large dams, are trying to help rivers reclaim their territory. Dams that no longer serve a useful purpose, are too expensive to maintain safely, or have harmful impacts are facing the axe especially in United States where the rate of decommissioning of large dams has overtaken the rate of construction since 1998.

The provision of adequate environmental flow releases from dams is an important means of achieving a compromise between overt exploitation of our rivers and a non-practical cessation of all use. Attempts have been made towards the assessment of these flows for the Ganga, and an ongoing project aims to achieve implementation of these flows in the Ramganga. The successful process of e-flows in India may indicate that it is going to be mainstreamed into water resource management policy.

 

Term Path Alias

/topics/large-dams-barrages-reservoirs-and-canals

Featured Articles
October 5, 2023 मामला केवल बड़े बांध का नहीं, बल्कि बहुत सारी छोटी परियोजनाओं का भी है, क्योंकि वे अगर तीव्र ढाल वाली नदी और नालों में बनने लगेंगी तो स्थानीय पर्यावरण का हश्र सामने होगा। वर्ष 2013 में उत्तराखंड के केदारनाथ और 2021 में धौली गंगा की त्रासदियों समेत पर्यावरणीय क्षति की अन्य बड़ी घटनाओं को सिर्फ बर्बादी के विचलित कर देने वाले आंकड़ों और दृश्यों के रूप में नहीं, बल्कि एक स्थायी सबक की तरह भी याद रखा जाना चाहिए।

पुराने पड़ते बांधों के खतरे
January 1, 2023 Results show the impacts of agricultural productivity boosts in India can be highly heterogeneous
Buckingham canal near Kasturba Nagar, Adyar (Image: India Water Portal)
December 4, 2022 What is the status of inland fisheries in India? Read these situational analysis reports to know about inland fisheries, the life of the fisherfolk, governance and tenure in inland fisheries and threats to the sustainability of inland fisheries.
Fishing in an irrigation canal in Kerala (Image Source: Martin Pilkinton via Wikimedia Commons)
November 23, 2022 Inspite of the realisation that minimum flows are essential for rivers to maintain their health and biodiversity, water released from various dams in India continues to disregard minimum environmental flow requirements.
Cauvery river at Hogenakal, Karnataka. (Source: IWP Flickr Photos via Claire Arni and Oriole Henri)
March 25, 2022 Dammed and bound, will the beautiful river Teesta survive India's insatiable demand for electricity?
Heaven on earth: A view of the Teesta from the coronation bridge (Image Source: Paramanu Sarkar via Wikimedia Commons)
November 21, 2021 Upstream hydrological modifications altered the basin hydrology, says study
Kathiya Gaon, Tehri, Uttaranchal (Image: India Water Portal)
Wake up call on reservoir siltation nationwide
Storage capacities of the reservoirs have been dropping and the loss is alarming; what's worse, little is being to done to stop the wastage Posted on 28 May, 2009 09:30 AM

"Wake up call on reservoir siltation nationwide", is a note by Himanshu Thakkar & Swarup Bhattacharyya, written in October 2006, on how storage capacities of the reservoirs have been dropping at an alarming rate, and how little is being to done to stop the wastage.

Concurrent monitoring of the world's largest drinking water pipeline project - A study of Narmada based project in Gujarat
The report provides comprehensive review of Narmada project and scope to improve the performance of the project by reorienting the state policy for drinking water Posted on 27 May, 2009 02:56 PM

This report presents the findings of a study done by Pravah on the concurrent monitoring of the world's largest drinking water pipeline project, the Narmada project, which is supposed to cover 9633 villages an 131 towns of Saurashtra, Kutch and parts of North Gujarat.

Water issues faced in Hyderabad metropolitan city - A presentation by Hyderabad municipal water supply and sewerage board
The presentation deals with the present capacity, supply and supply situation, allocation of Singoor water and the Krishna water supply scheme Posted on 12 May, 2009 12:36 PM

This presentation by M G Gopal of the Hyderabad Metropolitan Water Supply and Sewerage Board deals with the water issues faced in the city. The issues presented include – (a) Inter-sectoral allocation (b) Meeting the demand (c) Maintaining quality standards (d) Reducing unaccounted for water (e) Recycle and reuse (f) Promoting rainwater and conservation (g) Implementation of CDS and (f) Is ‘privatisation’, a solution or a disaster?

Improving flood management and water quality: a case study of Chicago, United States of America
The presentation provides an overview of the O’Hare CUP reservoir in Chicago, in particular its capacity, construction details, service area and the average annual flood savings ($2.3 million) Posted on 11 May, 2009 02:23 PM

These presentations deal with a case study of the work done in Chicago City in the United States of America to improve flood management and water quality. In order to save construction costs, the reservoir side walls are composed of geomembrane liner over compacted clay.

The Sambalpur declaration on Odisha rivers : Let the river flow
The Sambalpur declaration on Odisha rivers : Let the river flow Posted on 23 Apr, 2009 12:04 PM

Water Initiatives Orissa(WIO) and the Indian River Network (IRN) organsied the Odisha River Conference during 18 - 20 April 2009 at Sambalpur, Odisha. Attended by about 75 participants which included activists, environmentalists, journalists, academicians, researchers and civil society representatives from across the country, the Conference has just concluded with a "Sambalpur Declaration" that calls for saving the rivers from the current fate of high rate of degradation and giving communities their traditional rights over the rivers, among other strong resolutions.

Hydroelectric power projects & climate change: A case study of Ravi basin in Himachal Pradesh
The Role of Hydroelectric Power Projects in the Climate Change: A Case study of Ravi basin in Himachal Pradesh Posted on 09 Apr, 2009 11:34 AM

The following is a paper by Dr. Mohinder Slariya based on data collected during his Ph.D work. The work contains data sourced from the India Water Portal, and aims to illustrate local area climate changes with the development of hydroelectric projects. The abstract of the paper has been quoted below, with the full paper available as a download!

Abstract

Dams have had serious impacts on the lives, livelihoods, cultures and spiritual existence of indigenous, tribal and illiterate people, moreover on the physical environmental conditions and on the biodiversity of the area concerned. The dam related developmental activities in Ravi catchment area have been threatening the biodiversity in the whole catchment. There are more than 50 rivulets in the Ravi catchment and on which more than 70 power projects have been planned by the government by putting biodiversity at the stake. Developmental activities have unintentionally produce weather and climate modifications on a larger scale and threaten the existing biodiversity. Such developmental activities have been started day back in 1980s in Ravi basin with the installation of Baira Suil Power Project and today it has covered all most all Ravi basin starting from interstate broader of Jammu & Kashmir, Punjab and Himachal Pradesh and engulfed the green cover of the area. Because of this extinction the catchments area is experiencing drastic climatic changes, because of 100 km reservoirs of Shahpur Kandi (125MW), Thein Dam (600MW), Chamera-I (540MW) and Chamera-II (300 MW) and tunnelization of Ravi in 19.38 kms with a dia of 7 to 9 meters and 102 meters high surge shafts with 15.5 meters dia and underground power houses of Chamera-I & II and dry Ravi in almost all its natural route (27 kilometers in Chamera I & II). In this dry region there is a tremendous increase in the temperature and there is no timely and usual rain in the basin after the installation of power projects.

Request for photographs on dams for publishing in FlyLite magazine
Posted on 19 Mar, 2009 10:29 AM

Send to the Portal by Divya Mishra Assistant Editor FlyteLite ========== I handle a magazine called FlyLite (which is the in-flight magazine for JetLite) and for our April issue, we're carrying a story on the dams and bridges of India. We are currently looking for images for the following structures: 1. Gandhi Setu, Patna 2. The Grand Anicut Dam, Tamil Nadu 3. Idukki Dam, Kerala 4. Hirakud Dam, Orissa 5. Krishna Raja Sagara Dam, Karnataka

Stay on suspension of Loharinag project!
Stay of the Central Government decision to suspend Lohari Nag , Pala (600MW) power project by Nainital High Court- a blow to the Environment and People of Uttarakhand Posted on 13 Mar, 2009 01:29 AM

It is with great disappointment that Raksha Sutra and Uttarakhand Nadi Bachao Andolan received the news from the report in Amar Ujala, Dehradun 27.02.09 that the Uttarakhand High Court has granted a stay to the Central Government Order suspending the work on the Loharinag , Pala (600 MW) hydroelectric project. The work on the project has begun with hardly a break in its stride. The Public Interest Petition filed by Rural Litigation and Entitlement Centre, a Dehradun based NGO filed for a stay stating that neither would the natural flow of the river be affected nor is the project causing any environmental damage is a total falsehood. The petitioners have deliberately misled the High Court. They have not visited the site for themselves and have filed for a stay from the sanitised environment of Dehradun. We who live and work in Uttarkashi know the truth. This is not the first instance that this NGO has taken legal action to restart projects that have been stopped because of their dubious benefits. It is quite clear that unlike its name this NGO is working not for rural entitlement but rather for the entitlement of vested interests. This is very saddening. The environmental impact of the project is enormous. Entire mountainsides have been scarred and shorn of their green cover. Thousands of tonnes of excavated rock from the tunnel construction have been dumped on the riverside and threaten to block the flow of the river with the onset of monsoon. The dust being churned day and night by the hundreds of dumpers and trucks operating on the project is choking all life on both sides of the river. Fields that were the mainstay of the primarily agricultural community are lying barren because no growth has taken place for the last 3 years despite the best efforts of the farmers. Pastures which sustained the livestock of the village people have been devastated. Representations by the people to the government and NTPC have yielded no satisfactory results. We have photographic and video evidence of this.

Captive Ganga : Tunnels in Uttarkashi : Article in FrontLine
Captive Ganga : Tunnels in Uttarkashi : Article in FrontLine Posted on 12 Mar, 2009 11:56 AM

Oustees demand stoppage of Maheshwar dam in front of Environment Monitoring Committee
The oustees of Maheshwar Dam demanded immediate stoppage of Maheshwar dam in village during the visit of the Monitoring Committee constituted by the Ministry of Environment and Forest. Posted on 11 Mar, 2009 08:48 AM

The oustees of Maheshwar Dam demanded immediate stoppage of Maheshwar dam in village during the visit of the Monitoring Committee constituted by the Ministry of Environment and Forest. The oustees told the Committee that the project authorities have completely failed to rehabilitate the oustees but the construction work is going on full pace. Therefore, as per the conditions of the clearance the dam work should be stopped.

The Monitoring Committee: It may be stated that on 1st May 2001, the Ministry of Environment and Forest transferred the statutory clearance regarding Maheshwar Project to the Shree Maheshwar Hydel Power Corporation Limited (SMHPCL), the company building the dam. As per this clearance a Monitoring Committee was constituted to ensure that the rehabilitation work should be carried out at the same pace of concreting. The Committee headed by Mrs. Nirmala Buch visited the area on 23rd and 24th of February,2009.

×