Large Dams, barrages, reservoirs and canals

Dams have often been regarded as man’s response to nature’s vagaries, to mitigate flood and drought by containing water and releasing it as per demand and supply. Lately, dams are seen more as hydropower generators with flood mitigation, irrigation and drinking water supply only being additional benefits. This can be because of the increased acceptance that dams and canals, as awe inspiring as their structures might be, fail to deliver water to more than half of their commands. However, data and experience tell us that even the hydropower generation is also falling way below the promised numbers.

History and extent of dams in India

India’s first dam is the Kallanai built on the Cauvery river by King Karikalan of the Chola dynasty around 2,000 years ago. The dam, which is still functional and irrigates millions of acres, spans 329 m in length and 20 m in width. However, it was only post-independence that India’s love for big dams became more intense with the commissioning of a slew of projects including the Hirakud (1957), Gandhisagar (1960), Bhakra-Nangal (1963) and Nagarjuna Sagar (1967). Since then, the country has been continuously working on reining in its rivers for want of power, irrigation and domestic and industrial water supply needs. Almost half of the large dams in the country were built in the two decades of 1970-90. Maharashtra has the maximum number of large dams in the country (1845) followed by Madhya Pradesh (905) and Gujarat (666).

Map of major dams in India

A multi-purpose dam project includes one or more dams, infrastructure for generation of hydropower, infrastructure for housing of workers and for offices, a distribution network of canals and pipe systems, and access roads. All these have their individual and cumulative impacts on the river and the surrounding environment. Here also lies an opportunity to minimise the 'collateral damage' caused by dam projects by minimising the footprint of these adjuncts.

Dams as power generators

Hydropower is often billed as a renewable, economic and non-polluting source of energy and hence there is an increased emphasis on building dams especially in the hydrologically-rich but geologically-fragile Himalayan states. An assessment study put the hydroelectric power potential of the country at about 84,000 MW with maximum schemes envisaged on Brahmaputra basin (226) followed by Indus basin (190) and Ganga basin (142).

Possibility of revenue generation through sale of power units to other states and private players remains the main draw for state governments to invite project developers. However, reports suggest that poor financial conditions of discoms make it a poor proposition. Average generation per MW of hydro capacity in India in 2014-15 was over 20 per cent less than that in 1993-94.

Dams and canals for irrigation

Canal system of irrigation had been prevalent in India for centuries but it was the Ganga Canal that laid the foundation for large scale diversion of water to farms.

Number of dams in various statesThough the work was undertaken under the leadership of British Colonel Proby Cautley, it was the traditional acumen of local villagers that made the vast network possible. The canal was commissioned in 1855 irrigating around 5,000 villages. Today, the system irrigates nearly 9,000 km² of agricultural land in 10 districts of Uttar Pradesh and Uttarakhand.

The start of the Green Revolution in the mid 1960s put the spotlight on canal irrigation as the new hybrid crop varieties bred on heavy dose of chemical fertilizers and pesticides demanded assured irrigation. However, the increased investment and network expansion dealt little benefits. The World Commission on Dams in its year 2000 report found that the contribution of large dams to increased food grains production in India was less than 10 percent.

Loss in seepage, huge demand-supply gap, diversions under political pressures and comparatively easier and local availability of groundwater through pervasive use of borewells are the reasons for decline in efficiency trend.

Between 1996-97 and 2002-03, the area under canal irrigation declined by 2.4 million ha (13.8 per cent), the area under tank irrigation fell by 1.4 million ha (42.4 per cent), and the area irrigated by all other sources declined by 1 million ha (28 per cent). The only irrigation source that increased its share was groundwater wells, by 2.8 million ha (more than 9 per cent).

A study of 210 major and medium irrigation projects by SANDRP used the data supplied by the Ministry of Agriculture to show that after investing Rs 130,000 crore, these delivered 2.4 million ha less irrigation during 1990-1 to 2006-7. This means, the governments have to invest twice as fast in canal irrigation projects every year just to keep their command areas from shrinking

The study said that around Rs 1,00,000 crore was wasted in the name of improving irrigation. Feasibility studies were fudged in the case of most of the projects with huge investments, over-optimistic predictions were made and very little money was earmarked for basic maintenance such as desiltation. In some cases, political interests ensured that water was diverted to unviable areas at the cost of needier regions.

Dams and flood control

The efficiency of dams to withhold floods has always been put to question. Critics have also termed dams as harbinger of floods claiming that the essential scientific assessment for consistent release of water to avoid build up is rarely done.

Absence of a standard operating procedure for releasing water from the dam gates was evident in 2014 when 24 students picnicking in a river were swept away due to sudden release of water from Larji dam in Himachal Pradesh

Similarly, area downstream of Hirakud dam in Odisha has witnessed 14 floods in recent past with nine caused by sudden release of water from the dam. A major reason is that the dam has not changed its flood control strategy for 23 years while the rainfall pattern has undergone major changes in local areas. Lack of a coordination mechanism between neighbouring states about water flow also leads to emergency situations like one in 2011 when sudden release of water flow from upstream dams in Chhattisgarh led to breaching of danger mark in Hirakud.

In Gujarat, sudden release of large quantities of water from Ukai dam led to the biggest flood of 34 years in Tapi river submerging over 80 per cent of Surat, killing 150 persons and stranding over 20 lakh. Similar examples have been reported from other states.

Problem with 'training rivers'

Dams cause a disruption in the flow of a river by transforming it into a series of pools separated by dry stretches. The environmental impacts can be felt on the landscape, water resources, forest cover, and biodiversity. The Himalayas are almost equally distributed between zones 4 and 5. While a series of dams are being constructed in a seismically vulnerable and ecologically fragile zone, not only is optimisation of the planned development not considered, but the cumulative effects of the dams also are not considered. On a local level, blasting increases the possibility of landslides, and causes air and noise pollution. Quarrying on hill slopes and in the riverbed causes pollution and destabilisation of the slopes.

The large scale construction that is an inescapable part of hydropower development leads to deforestation. It has been observed that construction leads to the inadvertent loss of much more forest than has been accounted for. The presence of a dam on a river also impacts the ecosystem by bringing about a drastic change in the species composition. Invasive species tend to appear and flourish while suppressing endemic species and even causing some to become extinct. 

An affidavit filed by Ministry of Environment and Forest in the Supreme Court admitted the role of hydropower projects in Uttrakhand disaster in 2013. It said that “the maximum damage sites in the disaster affected areas (were) located either upstream or immediately downstream” from hydropower projects.

According to a paper by the United Nations Environment Programme, dams and their associated reservoirs permanently impact on freshwater biodiversity by several processes. Climate change has also been linked with dams. Studies show that large dams cause anoxic decomposition which leads to the formation of methane gas. This ‘greenhouse gas’ produced by dams may contribute to global warming to an appreciable extent. According to a study, dams contribute about 24 per cent of the total methane emissions in the world. Of these emissions, India contributes slightly under 28 per cent.

Submergence and displacement

Though the benefits of a dam are often exaggerated, the estimates related to land submergence and possible displacement of people are invariably kept low to paint a positive picture.

From Hirakud to Bhakra Nangal to Tehri and many more, scores of affected families were not rehabilitated at all. Those rehabilitated also complained about lack of livelihood opportunities and poor living conditions. Narmada Valley project, around which a big people's movement was built, remains the most controversial irrigation and hydropower plan. Envisaging around 30 irrigation and hydroelectric multipurpose dams, the project's environmental and social costs vis-a-vis the benefits have been cause of much debate and litigations. Sardar Sarovar dam, the largest structure on Narmada river, is believed to have displaced over 3 lakh families and is expected to displace additional 2.5 lakh families if its height is further increased by recently-approved 17 metre.

The World Commission on Dams in its report says: “While dams have delivered many benefits and made a significant contribution to human development, in too many cases the price paid to secure those benefits, especially in social and environmental terms, has been too high and, more importantly, could have been avoided.”

Political issues around dams

Shortage of water is increasingly being felt resulting in conflicts across the world. For the same reason India is facing disputes both within and outside its boundaries. While Punjab, Haryana and Rajasthan are fighting over water sharing from Bhakra Nangal, Kerala and Tamil Nadu went to court on diversion of water from Mullaperiyar dam.

On the other hand, Pakistan claimed that design of Baglihar project in Jammu and Kashmir violated the Indus Water Treaty whereas India is wary of China's plan to tame Brahmaputra waters through a series of dams. Similar are the concerns of Bangladesh which lies further downstream over India's attempt to build dams.

Way forward

It is evident that instead of focusing on building new dams, we need to attend to underperformance of existing projects. Decentralised solar, wind energy and small hydroelectricity projects with local communities as their managers as well as consumers can offer sustainable alternatives to big dams. This will not only mitigate ecological and social impacts of power generation but also reduce cost of power generation and distribution.

For irrigation purposes, revival of traditional community-managed networks like kuhls of Himachal Pradesh, phad irrigation of Maharashtra and recharging of underground aquifers through rainwater

The World Commission on Dams lists seven steps as a remedy to issues arising from dams. These include gaining wide public acceptance, exploration of alternatives to dams, optimal usage of existing structures, protection and restoration of ecosystems at river basin level, recognising entitlements of the affected people, compliance with applicable regulations and regional co-operation on trans-boundary rivers.

A few of the western countries, having realised the futility of large dams, are trying to help rivers reclaim their territory. Dams that no longer serve a useful purpose, are too expensive to maintain safely, or have harmful impacts are facing the axe especially in United States where the rate of decommissioning of large dams has overtaken the rate of construction since 1998.

The provision of adequate environmental flow releases from dams is an important means of achieving a compromise between overt exploitation of our rivers and a non-practical cessation of all use. Attempts have been made towards the assessment of these flows for the Ganga, and an ongoing project aims to achieve implementation of these flows in the Ramganga. The successful process of e-flows in India may indicate that it is going to be mainstreamed into water resource management policy.

 

Term Path Alias

/topics/large-dams-barrages-reservoirs-and-canals

Featured Articles
October 5, 2023 मामला केवल बड़े बांध का नहीं, बल्कि बहुत सारी छोटी परियोजनाओं का भी है, क्योंकि वे अगर तीव्र ढाल वाली नदी और नालों में बनने लगेंगी तो स्थानीय पर्यावरण का हश्र सामने होगा। वर्ष 2013 में उत्तराखंड के केदारनाथ और 2021 में धौली गंगा की त्रासदियों समेत पर्यावरणीय क्षति की अन्य बड़ी घटनाओं को सिर्फ बर्बादी के विचलित कर देने वाले आंकड़ों और दृश्यों के रूप में नहीं, बल्कि एक स्थायी सबक की तरह भी याद रखा जाना चाहिए।

पुराने पड़ते बांधों के खतरे
January 1, 2023 Results show the impacts of agricultural productivity boosts in India can be highly heterogeneous
Buckingham canal near Kasturba Nagar, Adyar (Image: India Water Portal)
December 4, 2022 What is the status of inland fisheries in India? Read these situational analysis reports to know about inland fisheries, the life of the fisherfolk, governance and tenure in inland fisheries and threats to the sustainability of inland fisheries.
Fishing in an irrigation canal in Kerala (Image Source: Martin Pilkinton via Wikimedia Commons)
November 23, 2022 Inspite of the realisation that minimum flows are essential for rivers to maintain their health and biodiversity, water released from various dams in India continues to disregard minimum environmental flow requirements.
Cauvery river at Hogenakal, Karnataka. (Source: IWP Flickr Photos via Claire Arni and Oriole Henri)
March 25, 2022 Dammed and bound, will the beautiful river Teesta survive India's insatiable demand for electricity?
Heaven on earth: A view of the Teesta from the coronation bridge (Image Source: Paramanu Sarkar via Wikimedia Commons)
November 21, 2021 Upstream hydrological modifications altered the basin hydrology, says study
Kathiya Gaon, Tehri, Uttaranchal (Image: India Water Portal)
Software for reservoir analysis – A research report by National Institute of Hydrology
The report describes a software developed by NIH for reservoir analysis in view of the operational problem and the non-availability of generalized software for reservoir analysis. Posted on 28 Jun, 2010 05:14 PM

The report describes a software developed by the National Institute of Hydrology (NIH) for reservoir analysis in view of the importance of reservoir operation problem in the Indian context and the non-availability of generalized software for reservoir analysis.

Effect of channel characteristics on flood wave propagation - A research report by National Institute of Hydrology
This study attempts to explain flood wave propagation in natural and artificial channels within the perspective of site-specific rating curve. Posted on 27 Jun, 2010 08:06 PM

The study attempts to explain flood wave propagation in natural and artificial channels within the perspective of site-specific rating curve. The study looks at the impacts of channel characteristics – bed slope, flood plains, channel shape, expansion-contraction combination, inactive storage, Manning’s roughness, expansion and contraction on flood wave propagation.

Modeling of flow in the canal due to breach of bank - A research report by National Institute of Hydrology
The study develops the wavelet element method for hydrological application purposes in general and modeling of flow in a canal due to breach of bank because of rainfall and cyclones. Posted on 27 Jun, 2010 12:15 AM

The study develops the wavelet element method for hydrological application purposes in general and modeling of flow in a canal due to breach of bank in particular. Due to high seasonal variability of rainfall and cyclones in coastal India, flood discharges cause frequent breaching of canals.

Canal breach modeling is of great significance in open channel hydraulics. The study of breach of a canal is a relatively new one as compared to dam breach, which is a well researched field. The analysis of the problem is complicated due to dynamics of flow within the canal. The limitations of the above model due to the one-dimensional model analysis of the problem is hoped to be overcome in two or three dimensional analysis.

Flood control regulation of a multi-reservoir system - A research report by National Institute of Hydrology
The report describes the software, which has been developed for flood control regulation of a system of reservoirs. Posted on 26 Jun, 2010 01:41 PM

The report describes the software, which has been developed for flood control regulation of a system of reservoirs. The reservoirs can be gated or ungated, and the system can have any combination including weirs and diversions. For operation of reservoirs, the scenario has been divided into two categories depending on the reservoir level and inflows - normal operation and emergency operation.

The input data requirements of the software are modest. This software along with previously developed software for conservation operation would provide a complete set of tools to analyze any system configuration for the range of purposes for which reservoirs are commonly built in India.

Application of Geomorphological Instantaneous Unit Hydrograph and Geographical Information Systems based approach for flood estimation – A research report by National Institute of Hydrology
The study attempts to apply Geomorphological Instantaneous Unit Hydrograph (GIUH) and Geographical Information Systems (GIS) based approach for flood estimation Posted on 25 Jun, 2010 10:33 PM

The study attempts to apply Geomorphological Instantaneous Unit Hydrograph (GIUH) and Geographical Information Systems (GIS) based approach for flood estimation. The design storm data of four catchments along with morphological characteristics have been considered. The geomorphological parameters and time area diagrams for each of the dam catchments were generated using the GIS package, Integrated Land and Water Information Systems (ILWIS).

The geomorphological parameters together with the time-area diagram forms an important input for the GIUH based Clark model. This model has been applied for deriving the instantaneous unit hydrograph and thereby to estimate the design flood in four dam catchments located in Luni and Chambal basins in Rajasthan viz. Jawai, Sei, Gamabhiri and Alnia. A review of the previous studies carried out using GIUH approach has been presented. Furthermore, a review of studies carried out using GIS techniques is also provided.

Snow and glacier contribution in the Satluj river at Bhakra dam - A research report by National Institute of Hydrology
The study estimates the average contribution of snow and glacier melt runoff in the annual flow of Satluj river at Bhakra dam. Posted on 25 Jun, 2010 12:07 AM

The study estimates the average contribution of snow and glacier melt runoff in the annual flow of Satluj river at Bhakra dam. This study is restricted to the Indian part of Satluj basin. A water balance approach was used to determine the average snow and glacier contribution to the annual flows.

Changes in land use and land cover and establishment of SCS runoff Curve Number in Suddagedda basin – A research report by National Institute of Hydrology
The study was taken up as a part of the representative basin studies being done by NIH and involved hydrological land use & land cover mapping for the Suddagedda basin of Andhra Pradesh. Posted on 24 Jun, 2010 11:52 PM

The study was taken up as a part of the representative basin studies being done by NIH and involved hydrological land use & land cover mapping for the Suddagedda basin of Andhra Pradesh. Mapping was carried out through visual interpretation for the years December 1987, April 1989, December 1992 and November 1996 using IRS IB-LISS II, LANDSAT 5-TM and IRS IC-LISS III data.

Land use and land cover are the most important surface characteristics of a basin. They are very dynamic features over space and time and it is difficult to get real time information on them through conventional means. Planners need to update knowledge of natural resources, which can be obtained quickly, economically and accurately through remote sensing techniques. Further, the land use map of a basin or region provides hydrologically significant categories, which are essential for estimation of reliable runoff from ungauged basins.

Capacity evaluation of Bhakra reservoir using digital analysis of satellite data - A research report by National Institute of Hydrology
The study assesses sedimentation rate, water spread area and volume of the Bhakra reservoir in Satluj basin using remote sensing data for the years 1988-89 and 1996-97. Posted on 23 Jun, 2010 10:48 PM

The study assesses sedimentation rate, water spread area and volume of the Bhakra reservoir in Satluj basin using remote sensing data of IRS-1B satellite and LISS-II sensor data of the years 1988-89 and 1996-97. The original elevation-area capacity curves and the reservoir levels on the eight dates of pass of the satellite were obtained from the Bhakra Beas Management Board, Nangal.

Using the trapezoidal formula, the capacity in between the maximum (513.904 m) and minimum (450.436 m) observed levels was assessed for the year 1996-97. The loss of capacity till 1988-89 was 491.315 mcum and till 1996-97 was 807.354 mcum. These could be attributed to the sediment deposition in the zone of study of reservoir.

Remote sensing and GIS applications in zonation of waterlogging in command areas – A research report by the National Institute of Hydrology
The study assesses waterlogging in a canal command area in Rohtak and Jhajjhar districts through waterlogging area zonation using multi-spectral imagery data of pre and post monsoon period. Posted on 21 Jun, 2010 04:48 PM

The study assesses waterlogging in a canal command area in Rohtak and Jhajjhar districts through waterlogging area zonation using multi-spectral and multi-temporal imagery like IRS LISS III data of pre and post monsoon period. Seasonal and permanent waterlogged area and standing water were delineated on the basis of remote sensing data, digital elevation model and groundwater data.

Geomorphology and soil erosion in Juni Nadi watershed - A research report by National Institute of Hydrology
The study estimates geomorphological parameters and soil loss using the USLE and GIS techniques for the Juni Nadi watershed in Jammu Siwaliks for developing soil conservation strategies. Posted on 21 Jun, 2010 02:17 AM

The study estimates geomorphological parameters and soil loss using the Universal Soil Loss Equation (USLE) and Geographical Information Systems (GIS) techniques for the Juni nadi watershed in Jammu Siwaliks with the idea of helping planners develop soil conservation strategies. Geomorphological characteristics of a river basin shape runoff processes and the occurrence of floods especially in the mountainous areas. In ungauged catchments with limited data, such as Juni nadi watershed, these parameters can be useful in understanding the hydrological characteristics. Reliable estimates of soil loss too can be useful in formulating watershed strategies to reduce soil loss to acceptable levels.  

×