Dr. Mohinder Kumar Slariya

Dr. Mohinder Kumar Slariya
Viability of Clean Development Mechanism (CDM) projects in India: Study of Chanju CDM project in Chamba district,Himachal Pradesh
The Clean Development Mechanism (CDM) is introduced by US government as flexibility mechanisms under Kyoto Protocol and allows developed countries to meet their emission reduction commitments by promoting clean development in developing countries. As a policy mandate, it aims to design project-based mechanisms to reduce emissions. These reductions are produced and then subtracted against a hypothetical baseline of emissions which are predicted to occur in the absence of a particular CDM project. India as a signatory of this protocol have been registered 2313 projects up to August 2010, out of these, 64 projects are of hydro power generation and Chanju power project of 36 MW is one of the CDM project in India. Dr Mohinder Kumar Slariya in this article showcases the primary data research based view point, which he presented in the "International Scientific Conference" at Hohenheim University, Germany. Posted on 03 May, 2012 06:30 PM

The present paper is an attempt of the researcher to make a comparative analysis between the expected benefits received by the executing agency under CDM and the actual benefits people are expected to receive from Chanju-I Hydro Electric Project.

Hydroelectric power projects & climate change: A case study of Ravi basin in Himachal Pradesh
The Role of Hydroelectric Power Projects in the Climate Change: A Case study of Ravi basin in Himachal Pradesh
Posted on 09 Apr, 2009 11:34 AM

The following is a paper by Dr. Mohinder Slariya based on data collected during his Ph.D work. The work contains data sourced from the India Water Portal, and aims to illustrate local area climate changes with the development of hydroelectric projects. The abstract of the paper has been quoted below, with the full paper available as a download!

Abstract

Dams have had serious impacts on the lives, livelihoods, cultures and spiritual existence of indigenous, tribal and illiterate people, moreover on the physical environmental conditions and on the biodiversity of the area concerned. The dam related developmental activities in Ravi catchment area have been threatening the biodiversity in the whole catchment. There are more than 50 rivulets in the Ravi catchment and on which more than 70 power projects have been planned by the government by putting biodiversity at the stake. Developmental activities have unintentionally produce weather and climate modifications on a larger scale and threaten the existing biodiversity. Such developmental activities have been started day back in 1980s in Ravi basin with the installation of Baira Suil Power Project and today it has covered all most all Ravi basin starting from interstate broader of Jammu & Kashmir, Punjab and Himachal Pradesh and engulfed the green cover of the area. Because of this extinction the catchments area is experiencing drastic climatic changes, because of 100 km reservoirs of Shahpur Kandi (125MW), Thein Dam (600MW), Chamera-I (540MW) and Chamera-II (300 MW) and tunnelization of Ravi in 19.38 kms with a dia of 7 to 9 meters and 102 meters high surge shafts with 15.5 meters dia and underground power houses of Chamera-I & II and dry Ravi in almost all its natural route (27 kilometers in Chamera I & II). In this dry region there is a tremendous increase in the temperature and there is no timely and usual rain in the basin after the installation of power projects.

×