Rivers

Term Path Alias

/topics/rivers

Featured Articles
April 18, 2024 As the demand for water from the Hindu Kush Himalaya region is expected to rise due to population growth, the impacts of temperature increases, and development requirements, researchers emphasise the urgent need to enhance scientific collaboration and rejuvenate existing treaties and governance structures.
Rivers of destiny (Image: Vikramjit Kakati/Wikimedia Commons; CC BY-SA 3.0 DEED)
February 20, 2024 This study predicts that sewage will become the dominant source of nitrogen pollution in rivers due to urbanisation and insufficient wastewater treatment technologies and infrastructure in worse case scenario projections in countries such as India.
The polluted river Yamuna at Agra (Image Source: India Water Portal)
October 16, 2023 अब वह दिन दूर नहीं कि गंगाजल की तरह सरयू जल को भी बोतल में सुरक्षित किया जा सकेगा और वह खराब नहीं होगा।सरयू नदी में पाए जाने वाले जीवाणु एवं विषाणुओं पर अध्ययन हेतु विज्ञान एवं प्रौद्योगिकी मंत्रालय के विज्ञान एवं अभियांत्रिकी विभाग की आर्थिक सहायता प्राप्त की है। इनके निर्देशन में शोध छात्रों द्वारा अस्पताल में संक्रमण करने वाले जीवाणुओं की पहचान और उनकी एंटीबायोटिक प्रतिरोधी बनने पर अध्ययन किया जा रहा है।
गंगा नदी,गंगोत्री
October 8, 2023 While the current push for legal personhood for rivers is facing obstacles and is stalled, it holds potential as a viable long-term strategy for the preservation of India's rivers
River quality deteriorates as demand for hydropower to support economic growth continues to expand. (Image: Yogendra Singh Negi, Wikimedia Commons; CC BY-SA 4.0 DEED)
July 18, 2023 पश्चिमबंगाल पंचायत चुनाव-2023 में पर्यावरण एक बड़ा अहम मुद्दा बना। नदी और पर्यावरण राजनीतिक दलों के एजेंडे से कहीं अधिक आम लोगों के आकर्षण का केन्द्र बने।
पश्चिमबंगाल पंचायत चुनाव
June 17, 2023 सहस्त्रधारा-बाल्दी नदी के किनारे के धनौला गांव में नदी पर अवैध निर्माण गतिविधियों के मुद्दे को सबसे पहले याचिकाकर्ता मीनाक्षी अरोड़ा ने उठाया था, जिनका इस साल 6 मार्च 2023 को निधन हो गया। उनके पति केसर सिंह अब सहस्त्रधारा-बाल्दी नदी मामले की पैरवी कर रहे हैं।

सहस्त्रधारा-बाल्दी नदी पर अतिक्रमण,फोटो सभागार:- केसर सिंह
Book: 'Kosi - The deluge' a must read for all those interested in flood management
The book "Kosi- The deluge" is a good report on the subject and contains a lot of valuable data Posted on 25 Nov, 2008 06:18 AM

The book is a must-read for those who have some interest in Flood Management and especially in Kosi.

It is priced at Rs. 100/- and is available with

Fact Finding Mission

Dalit Watch's report on Bihar flood relief camps in the wake of the devastating floods on the India-Nepal border in 2008
Here's Dalit Watch's report on the relief camps in the wake of the devastating floods on the India-Nepal border Posted on 25 Nov, 2008 05:33 AM

In September 2008, Dalit Watch published a report on its findings while monitoring 205 relief camps in the wake of the devastating floods on the India-Nepal border. This report records the damage caused by the breach on the embankment of the Kosi river in August 2008 and appraises the quality of relief efforts in the aftermath of the floods.

Report from Kosi flood affected Murliganj Block of Madhepura in Bihar: Asha Parivar and NAPM
Report from a visit to Kosi flood affected Murliganj Block of Madhepura in Bihar on 31st October and 1st November, 2008 Posted on 09 Nov, 2008 08:57 PM

Mahendra Yadav and his team of Asha Parivar is stationed in Babhangama, 15 kms. from Muraliganj Block headquarters of Madhepura Dist. of Bihar for over two months now to carry out relief operations and help people access relief from government schemes. Muraliganj is 80 kms. from Katihar railway station.

Relief report on the Bihar floods from the AID Eureka team, Chennai
Dharmendar and Oliver from AID Eureka Team, Chennai share their relief work experiences in Bihar Posted on 09 Nov, 2008 08:49 PM

This 8 page document states the approach made by the visiting team towards the disaster and the experiences of the workers on the ground. The report is detailed with covering the minutae of the relief work organized and implemented. It also takes a look at the final impact of the work on the beneficiaries.

Book Shelf : Special discount offer: Between the Devil & Deep Water : by Dr Mishra
The Kosi floods in Bihar stunned the world this year. But the real tragedy is that the disaster had been predicted. It was simply waiting to happen. Posted on 08 Nov, 2008 09:58 AM

The Kosi floods in Bihar stunned the world this year. But the real tragedy is that the disaster had been predicted. It was simply waiting to happen. The Kosi embankments were completed in 1963 with a designed life span of 35 years.

Who cares about the public? A first hand report of the tensions prevailing around the Kosi in Nepal and Bihar
Dinesh Kumar Mishra pens down emotions and responses of people living inside the Kosi embankment - to plug or not to plug Posted on 04 Nov, 2008 10:12 PM

The setting is unique. 34 Nepali villages within the embankments want the breach to remain opened. I talked to some of them and reminded them of the slogan that was in air at the time of construction of the embankments, "Aadhi Roti Khayengein, Kosi Baandh Banayengei".

Anatomy of a flood: The case of Kosi in 2008
Nature’s rage has been written about in such graphic detail that one needs to consider how and why disasters happened, whether it was avoidable and what lessons might be gleaned from it Posted on 25 Sep, 2008 09:24 AM

More than 17 million people have been affected in India, Bangladesh and Nepal by the recent floods in South Asia. Around 3 million people have been rendered homeless and more than one million are now living in relief camps.

Of Deluge, Candles and Matchboxes
The article discusses the impact of the breach of the Kosi river embankment and the technical flaws in its construction, and its current state. Posted on 24 Sep, 2008 11:26 PM

Guest Post by: Dinesh Kumar Mishra

The foundation stone of the Kosi Project was laid on January 14, 1955 amidst fanfare, jubilation and victory. Dr. Shrikrishna Sinha, thgen Chief Minister of Bihar, laid the foundation stone near Bhutaha village close to Nirmali, in Saharsa (now Supaul) district with the chanting of mantras by Pt. Mahabir Jha of Jhitki village and shouting of slogans like 'Aadhi Roti Khayengein, Kosi Bandh Banaayengein.' (We will eat only half a chapati but we will surely build the Kosi embankments). A majority of people lost the other half of the bread too on the 18th August 2008 when the Kosi embankment breached on that day.

Col. Townsend of the US Army while deliberating in a seminar organized by the American Society of Civil Engineers to discuss the Mississippi floods of 1927 had said that even the best designed and carefully constructed embankments remain at the mercy of burrowing animals like rats, foxes, muskrats who can create a hole in the finest levee that has been devised, which if not closed within a few moments will ensure its destruction. The Mississippi River of the United States broke loose in 1927 inundating an area of 51,200 sq. kilometer and damaging property to an estimated extent of two hundred million to a billion dollars. The breaches drove nearly three quarters of a million people from their homes and six hundred thousand of them were dependant on Red Cross. The wealth and power of the United States enabled much to be done for the sufferers, still they suffered. He further added a 'careless supervisor and dark nights' to the list destroyers of embankments. His observations remain valid till date as the Kosi comes out of its shackles in Kusaha in Nepal some 13 kilometers upstream of the Kosi Barrage. All the eight breaches that have occurred so far can be brought under these categories.

Col. Townsend gave benefit of doubt to the planners and engineers when he prefixed 'best designed and carefully constructed' adjectives to the embankments. The Kosi has breached its embankment eighth time and it is for the first time that the 'disaster' has generated so much of interest. These embankments are spaced at an average distance of 9 to 10 kilometers below the barrage with a maximum width of 16 kilometres between Kisunipatti and Bhaptiahi and minimum width of nearly 3 kilometres at the barrage itself. The spacing of the embankments is only 8 kilometres at the tail end, between Baluaha Ghat and Ghonghepur. In Nepal portion the spacing between them is restricted to between 3 to 6 kilometers. Common sense suggests that the spacing between the embankments should increase as the river advances further as more and more streams join the river from western side. This simple common sense was kicked around when these embankments were constructed in late 1950s. There were 304 villages with a population of 192,000 (1951 census) going to be trapped between the embankments and each one of them was trying to be located outside the embankments. Later the embankments were extended and 380 villages of Bihar and 34 villages of Nepal came within them. Their current population is nearly 1.2 million. The village locations were fixed and it was the embankment on either side of the river that could be moved. So did it happen. Now the embankment alignment is a caricature of what it was designed, if there was any design.

Report from the Disaster Management Division on the Southwest monsoon and the daily flood situation as on 13.09.08
The Ministry of Home Affairs, (Disaster Management Division) has released an summary of events regarding the Southwest monsoon and the daily flood situation Posted on 14 Sep, 2008 10:08 PM

The report ( current as on 13th September, 2008 ) provides a concise overview of the daily flood situation, action taken so far and provides detailed statistics on the issue. The report also includes meteorological forecasts and analysis of current and possible flood situations in the different areas of concern.

Discussion forum news !
Why are all the laundry powder and dish washing products still allowed to pollute unchecked all waterways with millions of tons of said salts.
Posted on 11 Sep, 2008 10:27 PM

A very interesting thread has been initiated on the Discussion Forum on the Portal by Bob Eibl.

×