This document by Ministry of Drinking Water and Sanitation provides essential components that should form part of detailed project report in village/multi village’s rural piped water supply scheme.
The main components of the guidelines include
- Location
- Project execution and design period
- Population
- Water demand
- Present status of water supply and sanitation
- Institutional set up and details of formation of VWSC
- Details of preparation of village water security plan
- Proposed scheme-details of scheme components
- Cost estimates
- Life-cycle cost approach
- Operation and maintenance
- Water quality monitoring
- IEC and HRD activities
- Other design norms and practices
- Scheme completion schedule
- Completion reports
- Approval of projects
Click below to download the guidelines.
Path Alias
/articles/guidelines-preparation-detailed-project-report-rural-piped-water-supply-schemes-document
Post By: Sumathi Sivam